timmyshoota
04-15-2007, 04:09 PM
I need 3 things to get my Ion working. Help a brother out. Free stuff is greatly appreciated. :)
-Stock frame. Just need a bare frame, preferably without a gauge.
-2 barbs for the top of the solenoid.
-2 blue hoses that go from those barbs to the banjo fittings.
-Stock frame. Just need a bare frame, preferably without a gauge.
-2 barbs for the top of the solenoid.
-2 blue hoses that go from those barbs to the banjo fittings.